ATLANTA – (WABE) cove Co-founder and Principal Patrick Chopson, AIA joined WABE‘s “All Things Considered” to discuss El Niño construction risk and what a potentially wet winter could mean for projects across metro Atlanta.

With NOAA forecasting a strengthening El Niño and higher odds of above-normal rain across the Southeast, Chopson explained that the impact on job sites can go well beyond a single lost rain day. Saturated ground can make excavation and foundation work difficult long after the rain stops. Also, the weather days written into construction contracts are usually based on historical averages that may not account for an unusually wet season.

In the interview, Chopson walks through which stages of construction are most vulnerable to wet weather, how delays affect project costs and completion dates, and what Atlanta-area developers and builders can do now to prepare.

Want to hear the full WABE interview?